Closed for winter: how to check seasonal road closures in Japan before you plan
In Japan’s snow country, a mountain road that was open in early autumn can be shut until spring. Prefectural road offices, such as those of Fukushima, Nagano and Hokkaido’s Sorachi area, publish lists of the sections they close for the season, each with its own way of writing the dates. So the work is a short sequence: find who manages the road, read this season’s list, and check again on the day you travel.
Who this is for: visitors planning a winter drive or bus trip over a mountain road or pass in Hokkaido, Tohoku, Hokuriku or the mountains of central Japan.
The short version: find the road manager’s winter closure page for this season and read the section and the dates. Treat the dates as a plan: the Toyama prefectural government says the start and end of a restriction can change with conditions on site. On the day, check the live restriction page the road manager points to. Most of these pages are in Japanese only.
Your trip: If and Then
| If… | Then… |
|---|---|
| Your route crosses a pass or mountain road | Find the winter closure page of the office that manages that road and read this season’s sections and dates |
| The list gives a date as planned or open-ended | Check again close to your trip; the Toyama prefectural government, for one, says the start and end of its restrictions can change with conditions on site |
| You travel before or around a listed closure date | Check the live restriction page on the day |
| The page is in Japanese only | Use it anyway; the road number, place names and dates are what you need from it |
| You are heading to a ski resort | See Getting to a Japanese ski resort |
Who announces a closure, and where
| Road | Who announces | What to look for | On the day |
|---|---|---|---|
| Prefectural roads, and national routes a prefecture manages | The prefecture’s road department or a regional construction office | A winter closure list, as a web page or a PDF, published for the season | The live restriction page the prefecture points to |
| National roads managed by the national government | The national government’s regional bureau (Toyama, for example, points to the regional bureau for Hokuriku) | The road information system of the Ministry of Land, Infrastructure, Transport and Tourism (MLIT), which MLIT describes as showing road management information such as closures and restrictions | For national routes in Toyama, the website of the regional bureau for Hokuriku, as Toyama advises |
The Nagano prefectural government gives its reason in plain terms: its construction office in Saku says it closes the sections on its list for winter because snow and ice are severe enough to make traffic dangerous (the Saku office’s list, Japanese only).
For roads the national government manages, an MLIT page describes the ministry’s road information system as a place to check road management information such as closures and restrictions, and links to it (MLIT page, Japanese only).
How three prefectural lists write their dates
Each list sets out a season’s closures in its own way. The examples below describe, in our own words, what the lists showed when we checked on 2026-10-31; they are examples of the format, and this season’s list on each page is the one to use. Japanese lists label the season by fiscal year: Reiwa 8 is fiscal 2026, which runs into 2027.
| Where | How the list writes the period | Examples | Page updated |
|---|---|---|---|
| Fukushima (the prefecture’s list, Japanese only) | A start date and time, and no end date; sections still to close are marked as winter restrictions planned | National route 252, in the town of Tadami, from Tagokura (the prefectural border) to the free rest area at Tagokura: from 9:00 on Wednesday 4 November 2026, with no end date given | 22 October 2026 |
| Nagano, the prefecture’s construction office in Saku (the Saku office’s list, Japanese only) | Start and end date with a time, under a heading for the fiscal 2026 winter closures | National route 299, a section that includes the Jikkoku pass at the Gunma border in the town of Sakuho: from 11:00 on Friday 11 December 2026 to 11:00 on Tuesday 6 April 2027 | 30 September 2026 |
| Hokkaido, Sorachi (the Sorachi list, PDF, Japanese only) | A planned closure date and a planned reopening date for each road; the list covers October 2026 to June 2027 | The Shokanbetsu–Uryu station road: 22 October 2026 to 3 June 2027, the latest planned reopening on the list | — |
Two things stand out. The end of a closure is often an estimate or open-ended: Fukushima’s list gives no end date for some sections, and the Sorachi list says some sections will stay closed because of the risk of falling rocks. And a closure can run well into spring, so a trip in April or May still needs a check.
Read the dates as a plan
The Toyama prefectural government’s list of closed sections on prefectural roads, which covers winter closures together with closures for damage and long-term roadworks, gives each period as a start date and an expected end date, and some rows give no end date. It also states that the start and end of a restriction can change with conditions on site (Toyama’s list, Japanese only; updated 14 October 2026). Plan around the announced dates, and leave some slack in the days around them.
On the day you travel
Check the live information, not only the season’s list.
- Prefectural roads: use the live page the prefecture points to. Toyama, for example, sends readers to a road traffic information website run by a public-interest foundation (same Toyama page as above).
- National roads: Toyama sends readers to the website of the regional bureau for Hokuriku for national routes the national government manages. An MLIT page (Japanese only) links to the ministry’s road information system and describes it as a place to check road management information such as closures and restrictions.
English-language help
The lists above are in Japanese only. Two public English pages help with the background:
- Northern Road Navi — information closed during winter, from a research institute for civil engineering in cold regions, has a table of national roads in Hokkaido that close in winter, with periods such as “Beginning of November - End of April”. The page carries a 1999–2008 copyright line, so use the current prefectural or national list for this season’s dates.
- An article by the Japan National Tourism Organization (JNTO), What you Need to Know When Driving in Japan during Winter, reminds drivers to check the weather forecast for their destinations and notes that car navigation systems may not always have the latest road information.
If the road is closed
- The road you planned is closed: rebuild that day of the trip, and check the live page again before you set out on a different road.
- A road was open inside the listed period, or closed before it: the Toyama prefectural government says the start and end of its restrictions can change with conditions on site. Go by the live page on the day.
- You cannot read the Japanese page: look for the road number and the place names from your route, and the dates beside them.
Official sources
| Topic | Source | Checked |
|---|---|---|
| Why prefectures close roads in winter; Nagano (Saku) list | Nagano: the Saku office’s list (Japanese) | 2026-10-31 |
| Fukushima list | Fukushima: the prefecture’s list (Japanese) | 2026-10-31 |
| Hokkaido (Sorachi) list | Hokkaido: the Sorachi list (PDF) (Japanese) | 2026-10-31 |
| Changing dates; day-of checks | Toyama: the prefecture’s list (Japanese) | 2026-10-31 |
| National roads | MLIT page linking to its road information system (Japanese) | 2026-10-31 |
| English background | Northern Road Navi — information closed during winter · JNTO — What you Need to Know When Driving in Japan during Winter | 2026-10-31 |